Sunday, June 19, 2011

The Day of Reckoning



Ahhh... the much-awaited PCI is finally over.  It was a gruelling 3 hours - 1 hour for the walkthrough presentation and 2 hours for the actual inspection and noting of defects, re-work and un-done stuff.  I had my army of inspectors - dad, mum, niece and myself.  Hubby couldn't make it on the day itself but he had his own PCI version with the SS the previous day.  The SS was jotting down every item that we wanted addressed before the final inspection and hand-over  which is scheduled on Tuesday 28th June.

Major issues are as follows:
1.  Replace one of the front entry door panels and re-paint both doors.
2.  Re-paint part of the ceiling on the cinema room and garage where there has been a leak stain from the roof (leak has been fixed already but the re-painting was unsatisfactory)
3.  Stain and paint the 2 posts in the balcony.
4.  Clean and re-touch some parts of the rendering on the front porch, and balcony
5.  Replace defective window glass for one of the bedrooms
6. Silicone sealing around the externals of the house
7. Grouting of wet areas

Minor Issues:
1.  Replace dented door knob in the garage
2.  Fix loose brick in the garage
3.  Paint lintels in the garage and some windows
4.  Missing wine rack and pantry door handles
5.  Door stop for the powder room and cinema room
6.  A few bricks on the side and rear of the house need cleaning
7.  Paint touch-ups in some areas
8.  A storm pipe to be uncovered which they accidentally buried when they spread tapsoil around the house
9.  Replace light bulbs that aren't working
10. Fix loose toilet flusher in the powder room
11. Re-align wardrobe doors on bedroom 3 and 4

It was an exhausting exercise that I have totally forgotten to take photos of the house, LOL!

Saturday, May 21, 2011

Chasing the Finish Line


Almost there....  Our Practical Completion Inspection (PCI) is booked for the 16th of June.  The tiling has been completed on Friday when the garage door has been installed as well.  This Saturday, we found the electricians putting our lights and shower exhaust fans. We have added a few extra batten lights which we will be converting to downlights after hand-over.







Batten lights in the activity room upstairs

The tiled ensuite shower


The tiled laundry splashback