Showing posts with label Plumbing. Show all posts
Showing posts with label Plumbing. Show all posts

Monday, March 14, 2011

Tap, Wrap, Clap!

Hope everyone had a good long weekend! Our evaporative cooling unit was installed on Monday last week.  Plumbing rough-ins and electrical wirings were completed during the last week too. House is all wrapped up on the upper floor only. Materials for the next stages of the building have also been delivered.  Won't be very long and we will soon be locked out, no more free sneak-ins to the house. On the long weekend we were busy looking to buy furnitures for our house - a nice leather piece for the formal lounge, fabric cozy set up for the family room, and an eight-seater glass dining suite. Have also checked the lighting shops for some down-lights and pendant lights.

WEEK 8 PHOTOS

Evaporative Cooling Unit

Long and winding wires!

Electricals
Storm water drainway

Balcony drain pipes




Wrapped!

Wrapped view from the inside


Bricks!!!
Front Doors

Ceiling wall sheets






Sunday, March 06, 2011

Roof Tiling


Our frames invoice was e-mailed by our CLE on Monday morning and I happily obliged to arrange progress payment with our bank that afternoon (ouchhh, that's another $$$ addition to our mortgage now!). Tilers have started with the roof on Tuesday and finally completed on Wednesday.  On Friday, plumbing wires and what looks like as evaporative cooling ducts were installed.  We checked the other houses being built in our street and found out that there's another double storey that Carlisle has started constructing, excellent choice of builder dear neighbour!

WEEK 7  PHOTOS