Monday, March 14, 2011

Tap, Wrap, Clap!

Hope everyone had a good long weekend! Our evaporative cooling unit was installed on Monday last week.  Plumbing rough-ins and electrical wirings were completed during the last week too. House is all wrapped up on the upper floor only. Materials for the next stages of the building have also been delivered.  Won't be very long and we will soon be locked out, no more free sneak-ins to the house. On the long weekend we were busy looking to buy furnitures for our house - a nice leather piece for the formal lounge, fabric cozy set up for the family room, and an eight-seater glass dining suite. Have also checked the lighting shops for some down-lights and pendant lights.

WEEK 8 PHOTOS

Evaporative Cooling Unit

Long and winding wires!

Electricals
Storm water drainway

Balcony drain pipes




Wrapped!

Wrapped view from the inside


Bricks!!!
Front Doors

Ceiling wall sheets






4 comments:

  1. Hey Flipflop, don't you find all those electrical wires and plumbing pipes awesome. How do they know where they all go? Take lots of pictures and measurements including stud work for future reference. So impressed you have a bath....we were ages before that arrived. Exciting with gyprock and bricks next.

    ReplyDelete
  2. For such a big house they're making amazing progress Flipflop. I don't think we'll catch you now!!!

    ReplyDelete
  3. Flipflop, put a comment re aggregate question in your frames post by mistake!

    ReplyDelete
  4. Thanks Deb for the info. We are planning to visit Mentone one of these days.

    ReplyDelete